Past Projects

Supply of a 400V AC NSHV in MCC technology
- Consumer outlets in MCC technology
- design verification according to IEC 61439-1/2
- integrated automatic changeover
- integration into the control system
- installation incl. cable laying and connection work
- engineering, documentation and project management

Integration of a 220V DC NSHV system
- Consumer outlets in MCC technology
- design verification according to IEC 61439-1/2
- Diode coupling
- Integration into the control system
- Installation incl. cable laying and connection work
- Tying out and dismantling of the old system incl. temporary solution
- engineering, documentation and project management

Setting up a 220V DC battery system
- closed lead acid batteries with 800Ah
- ceramic funnel plug
- earthquake proof frame
- conductive battery bottom incl. measurement
- VEXAT document preparation
- project management, assembly and documentation

Construction of a stationary emergency power system
- 600kVA genset power
- Separation of tank room from genset room in F90 design
- Design according to Stage 3A emissions
- Sound insulation 75dB in 10m distance
- Control cabinet design according to machine guidelines
- Planning, delivery and assembly

Supply of a mobile backup power supply system
- design and delivery of 4 pcs. 60kVA units
- max. permissible trailer load: 2.000kg
- max. tank volume 200l
- designed for mains parallel operation
- powerlock plug niche
- engineering, delivery, registration and training

Maintenance of a standby power supply system
- Control cabinet checked with thermal imaging camera
- Messages checked
- Error memory read out
- mech. components serviced

Checking the batteries
- Maintenance according to manufacturer’s instructions
- Electrolyte density, nominal voltage, temperature
- capacity test by means of Torkel meter
- measurement of battery bottom leakage resistance
- report generation

Documentation tracking
- Circuit diagram creation on RUPLAN EVU module
- Front views on ACAD
- Cross-connection diagrams
- Customer-specific document structure

Testing of the electrotechnical system
- thermographic examination for contact resistances
- functional check of switchings and signaling system
- terminal check
- test report according to electrical protection ordinance

Engineering, assembly and IBN of an MSPG plant
- Medium voltage switchgear according to ÖVE/ÖNORM E8383
- Operating voltage: 20kV
- Ur = 24kV
- Ir = 1250A
- Production plans created on RUPLAN EVU module
- Incl. cable laying and connection work
- Integration into the control system

VEXAT document creation
- Zone definition
- primary explosion protection
- secondary explosion protection – avoidance of ignition sources
- Checking the structural design
- Implementation of organizational measures
- Preparation of protocols

Circuit breaker - Maintenance
- Checking the mechanical components
- Contact wear check
- Interlocking
- Trigger test with primary test system
- Preparation of protocols

Construction of a prototype - SF6 power supply monitoring
- Methanol fuel cell generator
- Nominal voltage 12/24 VDC
- Rated charging power 110W
- Solar panel 310Wp
- incl. remote modem antenna
- concept development
- Test runs and modernization
- Installation, commissioning and training

Structured cabling - FO data center
- IT- Fiber optic cable
- IT- patch panel 19″
- splicing work
- Measurement LWL OTDR MM
- Cabling and measurement

Construction of a 230V inverter distribution system
- Setup with IT network form
- ISO fault monitoring and location
- Number of consumer outlets 48
- Parameterization and integration into the control system
- Engineering, installation, cabling and documentation

Embedding a data collector cabinet
- Specification creation
- FAT factory acceptance
- check messages
- Installation incl. cable laying and connection work
- Engineering, documentation and project management

Supply of a 220V DC rectifier system
- in modular technology
- counter cell control
- customized system design
- integrated consumer outlet field
- integration into the control system
- installation incl. cable laying and connection work
- Dismantling and dismantling of the old system incl. provisional solution
- Engineering, documentation and project management

Planning of a transfer cabinet
- Outdoor cabinet
- Switching between mobile and stationary emergency diesels
- Powerlock plug niche
- Integration into the control system
- Delivery, installation and commissioning

Renewal of the automatic changeover
- 400V automatic transfer switch incl. control system connection
- Field control unit SICAM
- Integration into the control system
- Engineering, supply, installation and IBN

Renew 48V rectifier system
- Helicopter transport to the radio station
- 2 rectifiers and 2 stationary battery systems
- Check low voltage distribution
- Engineering, supply, installation and IBN

400V AC auxiliary power supply
- Consumer outlets in insert technology
- Design verification according to IEC 61439-1/2
- Integration into the control system
- Installation incl. cable laying and connection work
- Engineering, documentation and project management

Supply of a UPS system
- consisting of an IGBT rectifier and inverter
- rated voltage 400V
- Rated power 132kW
- battery circuit 630A
- consumer circuit 500A
- I&C integration IEC -60870-5-101 balanced
- Project management and documentation