Past Projects
Delivery of a 400V AC LV Switchgear in MCC Technology
- Outgoing feeders in MCC design
- Type testing according to IEC 61439‑1/2
- Integrated automatic transfer system
- Integration into the control system
- Installation including cable laying and connection work
- Engineering, documentation and project management
Integration of a 220V DC LV Switchgear System
- Outgoing feeders in MCC design
- Type testing according to IEC 61439‑1/2
- Diode coupling
- Integration into the control system
- Installation including cable laying and connection work
- Decommissioning and dismantling of the old system including temporary solution
- Engineering, documentation and project management
Installation of a 220V DC Battery System
- Sealed lead‑acid batteries, 800 Ah
- Ceramic vent plugs
- Earthquake‑resistant rack
- Conductive battery room flooring incl. measurement
- VEXAT documentation
- Project management, installation and documentation
Construction of a Stationary Backup Power System
- 600 kVA generator output
- Fire‑rated separation between tank room and generator room (F90)
- Execution according to Stage 3A emission standards
- Sound level: 75 dB at 10 m distance
- Control cabinet built according to machinery directives
- Planning, delivery and installation
Delivery of a Mobile Backup Power System
- Planning and delivery of 4 units, each 60 kVA
- Maximum permissible trailer load: 2,000 kg
- Maximum tank volume: 200 L
- Designed for grid‑parallel operation
- Powerlock connection panel
- Engineering, delivery, registration and training
Maintenance of a Backup Power System
- Inspection of the control cabinet using a thermal imaging camera
- Monitoring of system messages
- Reading of error memory
- Maintenance of mechanical components
Battery Inspection
- Maintenance according to manufacturer specifications
- Electrolyte density, nominal voltage, temperature
- Capacity test using Torkel test device
- Measurement of battery floor insulation resistance
- Test report creation
Documentation Update
- Creation of wiring diagrams using RUPLAN EVU module
- Front views in ACAD
- Cross‑connection diagrams
- Customer‑specific documentation structure
Testing of the Electrical Installation
- Thermographic inspection for transition resistances
- Functional testing of switching and alarm systems
- Terminal inspection
- Test report according to electrical safety regulations
Engineering, Installation and Commissioning of an MV Switchgear System
- Medium-voltage switchgear according to ÖVE/ÖNORM E8383
- Operating voltage: 20 kV
- Ur: 24 kV
- Ir: 1250 A
- Creation of manufacturing plans using RUPLAN EVU module
- Including cable laying and connection work
- Integration into the control system
VEXAT Documentation Preparation
- Zoning determination
- Primary explosion protection
- Secondary explosion protection – avoidance of ignition sources
- Inspection of structural implementation
- Implementation of organizational measures
- Documentation and report creation
Circuit Breaker – Maintenance
- Inspection of mechanical components
- Contact wear inspection
- Interlocking
- Trip testing with primary test system
- Report creation
Construction of a Prototype: SF6 Power Supply Monitoring
- Methanol fuel cell generator
- Nominal voltage: 12/24 V DC
- Nominal charging power: 110 W
- Solar module: 310 Wp
- Including remote modem antenna
- Concept development
- Test runs and modernizations
- Installation, commissioning and training
Structured Cabling – Fiber Optics for Data Center
- IT fiber optic cabling
- IT patch panel 19″
- Splicing work
- Fiber measurement LWL OTDR MM
- Cabling and measurement
Construction of a 230V Inverter Distribution System
- Built with IT earthing system
- Insulation fault monitoring and location
- Number of outgoing feeders: 48
- Parameterization and integration into the control system
- Engineering, installation, cabling and documentation
Integration of a Data Collector Cabinet
- Creation of requirements specification
- FAT (Factory Acceptance Test)
- Verification of system messages
- Installation including cable laying and connection work
- Engineering, documentation and project execution
Delivery of a 220V DC Rectifier System
- Modular design
- Counter‑cell control
- Customized system configuration
- Integrated outgoing feeder panel
- Integration into the control system
- Installation including cable laying and connection work
- Decommissioning and dismantling of the old system including temporary setup
- Engineering, documentation and project execution
Design of a Transfer Cabinet
- Outdoor cabinet
- Transfer switching between mobile and stationary emergency diesel systems
- Powerlock connection interface
- Integration into the control system
- Delivery, installation and commissioning
Renewal of the Automatic Transfer System
- 400V automatic transfer system incl. control system integration
- Field control device: SPRECON‑E‑C
- Engineering, delivery, installation and commissioning
Renewal of a 48V Rectifier System
- Transport to the radio station by helicopter
- 2 rectifiers and 2 stationary battery systems
- Inspection of the LV distribution
- Engineering, delivery, installation and commissioning
400V AC Auxiliary Power System
- Outgoing feeders in withdrawable (plugin) technology
- Type testing according to IEC 61439‑1/2
- Integration into the control system
- Installation including cable laying and connection work
- Engineering, documentation and project execution
Delivery of a UPS System
- Consisting of an IGBT rectifier and inverter
- Nominal voltage: 400 V
- Nominal power: 132 kW
- Battery circuit: 630 A
- Load circuit: 500 A
- Control system integration via IEC 60870‑5‑101 balanced
- Project execution and documentation
Photovoltaic System – Substation Weibern
- Output: 162 kWp
- 360 modules at 450 Wp each
- AC distribution cabinet
- Integration via power plant controller into the NetzOÖ grid
- Integration into the customer’s control system
Photovoltaic System – Substation Pongau
- Output: 70.98 kWp
- 156 modules at 455 Wp
- Installed on sliding bracket roof
- Integration into the customer’s control system
Photovoltaic System – Substation Wagenham
- Output: 63.7 kWp
- 140 modules at 455 Wp
- Installed on sliding bracket roof
- Integration into the customer’s control system